图书馆: 最近添加或更改


Pipe Tap Requirements (48” — 144” diameter)

图书馆、技术论文
The taps should be located in the longest unobstructed section of straight pipe available and easily accessible, and at positions a minimum of 8-10 pipe diameters from any upstream interference and 4-5 pipe diameters from any downstream interference.

Pipe Tap Requirements (up to 48” diameter)

图书馆、技术论文
These connections should be located on the return pipe to the cooling tower. They may be installed on a horizontal or vertical section of pipe providing an adequate straight run.

Thermal Performance Testing Information

图书馆、技术论文
Most testing done today is conducted using data acquisition systems to measure the temperatures. This discussion assumes this type of system is used.

Marley NC Steel Cooling Tower User Manual

图书馆、手册
Installation, operation and maintenance instructions - as well as those offered separately on motors, fans, float valves, etc. - are intended to assure that your NC tower serves you properly for the maximum possible time.

Marley NC Engineering Data

工程数据,图书馆
Engineering Data and Technical Reference for Marley NC cooling towers. The NC is now the highest capacity package cooling tower on the market, ranging from 101 to 1455 tons! The NC is the result of extensive design studies focused on cooling tower sound control.
zh_CN