Pipe Tap Requirements (up to 48” diameter)
首页 / 图书馆 / Pipe Tap Requirements (up to 48” diameter)
Pipe Tap Requirements (up to 48” diameter)
技术论文
These connections should be located on the return pipe to the cooling tower. They may be installed on a horizontal or vertical section of pipe providing an adequate straight run.可用的文档语言