Air Inlet Water Management
Cooling towers bring water and air into contact to drive heat transfer. At the interface, where air and water first meet, an important objective is to retain water inside the tower.
Film Fill Glueing Machine
The film-fill packing used inside cooling towers can be shipped as nested sheets in order to minimize freight, and assembled into packs at the jobsite. Marley now offers an efficient field glueing method for on-site pack making.
External Disc ARD
The Marley external Disc Anti-Reversing Device (ARD) backstop is a custom designed, welded stainless steel assembly that is bolted directly to a Marley Geareducer® with input shaft diameters from 1.125" up to 2.625".
Marley NC Everest – HVAC Applications
SPX Cooling Technologies embarked on a mission to design a cooling tower like no other in the world. The result, the Marley NC Everest, provides epic customer advantages, including 50% greater cooling capacity, higher energy savings, fewer components and lower maintenance costs.
Marley Insight – 301L Stainless Steel
Stainless steel, as an alternative to galvanized steel, has found widespread use in wet cooling equipment due to its excellent mechanical properties combined with its superior corrosion resistance.