Pipe Tap Requirements (up to 48” diameter)
Home / Library / Pipe Tap Requirements (up to 48” diameter)
Pipe Tap Requirements (up to 48” diameter)
Technical Papers
These connections should be located on the return pipe to the cooling tower. They may be installed on a horizontal or vertical section of pipe providing an adequate straight run.Available Document Languages