Forward-Thinking School Installs LW Fluid Coolers
Case Studies | Cooling Tower Installation | Video
To reduce the heat of their process fluids, the school would need two LW units. The units were hoisted into position using a crane that reached 200+ ft. into the air to install the fluid coolers onto a newly created platform atop the school’s roof.
en_US