Library: Most Recently Added or Changed


Pipe Tap Requirements (up to 48” diameter)

Library, Technical Papers
These connections should be located on the return pipe to the cooling tower. They may be installed on a horizontal or vertical section of pipe providing an adequate straight run.

Thermal Performance Testing Information

Library, Technical Papers
Most testing done today is conducted using data acquisition systems to measure the temperatures. This discussion assumes this type of system is used.

Marley NC Steel Cooling Tower User Manual

Library, Manuals
Installation, operation and maintenance instructions - as well as those offered separately on motors, fans, float valves, etc. - are intended to assure that your NC tower serves you properly for the maximum possible time.

Marley NC Engineering Data

Engineering Data, Library
Engineering Data and Technical Reference for Marley NC cooling towers. The NC is now the highest capacity package cooling tower on the market, ranging from 101 to 1455 tons! The NC is the result of extensive design studies focused on cooling tower sound control.

Marley Replacement Parts for NC Cooling Towers

Brochures, Library
Genuine Marley Parts from SPX Cooling Technologies, Inc. were installed at the factory to build your Marley Cooling Tower. To uphold the quality engineering and performance that define your cooling tower, insist on genuine Marley Parts for any service, repair or rebuild project.
en_US